Polycarbonate Roofing Sheet
Rooflights and roofing PC panels: confirm structure, loads, support, drainage, UV orientation and fixing details.
Find the PC application guide that matches the operating environment and responsible system design.
Choose the polycarbonate application guide that matches the job your panel must do. A rooflight, greenhouse cover, machine guard and battery component may all use PC, but they are approved against different conditions. Start with the operating environment below; each guide then points to the relevant panel or fabrication option and the information needed for a written quotation.

A greenhouse roof may need both daylight and condensation guidance; a transparent machine enclosure may need optical clarity and a documented guard design. Choose the guide for the failure or acceptance condition that will decide the project, then follow its links to the suitable PC product family. If you do not yet know the grade, send the application and drawing rather than guessing from a thickness chart.
Once you reach the right guide, prepare the environment or hazard, system or part drawing, panel dimensions, appearance target, quantity, destination and the required acceptance evidence. SinoPlastix can review a custom PC grade, sheet or fabricated part against that brief. The written quotation confirms the proposed specification, applicable minimum, price and production window; published values are planning averages and actual terms depend on complexity.
Where to look next
Rooflights and roofing PC panels: confirm structure, loads, support, drainage, UV orientation and fixing details.
Greenhouse PC glazing selected for crop light, condensation, climate, support and UV-facing orientation.
Polycarbonate facade infill: specify panel, frame, connections, loads and project fire requirements as one system.
Find the PC or acrylic sheet family first, then confirm the grade, drawing and order scope.
Start with a trial order
Send the grade, dimensions, quantity and destination, or upload a drawing. Your quote will show the applicable minimum, production window and FOB, CIF or DDP delivery basis.